Maersk Drilling周五上午在韩国DSME船厂举行仪式,将第四座(也是最后一座)能够抵御极恶劣环境的自升式钻井平台命名为“Maersk Invincible”。据悉,四座自升式平台总价值为26亿美元。前三座已由Keppel FELS交付,Maersk Invincible将由DSME船厂于2016年晚些交付。交付后,Maersk Invincible将赴北海执行与BP Norge签订的五年期约束性合同,在挪威北海Valhall油田开展封堵和弃井作业。
来自/Offshore Energy Today 10月14日消息 编译/赵美园石油圈原创www.oilsns.com
Maersk Drilling’s fourth and final XL Enhanced ultra harsh environment jack-up was named Friday morning at a ceremony held at the Daewoo Shipbuilding and Marine Engineering (DSME) shipyard in South Korea. And the rig was named Maersk Invincible. The four jack-up rigs represent a total investment of $2.6bn. The first three jack-up rigs have been delivered from the Keppel FELS shipyard, while the Maersk Invincible will be delivered from DSME later in 2016. After delivery from the yard, Maersk Invincible will mobilize to the North Sea and start a five-year firm contract with BP Norge for plug and abandonment work on the Valhall field in the Norwegian North Sea.
未经允许,不得转载本站任何文章:
-
- 赵美园
-
石油圈认证作者
- 毕业于南开大学翻译专业,具有丰富的翻译经验。致力于迅速、准确地传递国际油气行业新闻简讯。会时刻关注油气行业最新动态,呈现最迅捷、优质的国际油气资讯,让中国企业时刻把握国际油气动向,抓住商机,创造世界油气行业精彩未来。