马拉西亚公司Wah Seong Corporation (WSC)获得价值6亿欧元合同,为俄罗斯Nord Stream 2北方管道复线项目提供管道涂层服务。该项目将俄罗斯天然气经波罗的海供应到欧洲市场。
早在今年7月,WSC子公司Wasco Coatings Europe BV便获得了为Nord Stream 2项目提供混凝土配重涂层和管道存储服务的机会,但合同的签署有待各方最终协定。
该项目完成后,世界最大气田生产的天然气将跨越1200公里供应给欧洲消费者。Nord Stream 复线项目将仿照Nord Stream一号管线设计,并沿原管道线路铺设,两条管线自圣彼得堡东南部起,一直延伸到德国海岸城市Greifswald。
来自/Offshore Energy Today 9月13日消息 编译/赵美园石油圈原创www.oilsns.com
Malaysia’s Wah Seong Corporation (WSC) has signed a 600 million euros contract for the supply pipe coating services for the Nord Stream 2 pipeline, which will carry Russian gas to Europe through the Baltic Sea.
To remind, WSC’s subsidiary Wasco Coatings Europe BV was selected for the job in July, however, the contract signing was subject to final negotiations. The company will provide provision of concrete weight coating and storing of pipes for the Nord Stream 2 project.
Once completed, Nord Stream 2 pipeline will transport natural gas over 1,200km from the world’s largest gas reserves in Russia to consumers in Europe. Nord Stream 2 will follow the route and design of the first Nord Stream pipeline, each starting from south-west of St Petersburg and ending at German coast, Greifswald.
未经允许,不得转载本站任何文章:
-
- 赵美园
-
石油圈认证作者
- 毕业于南开大学翻译专业,具有丰富的翻译经验。致力于迅速、准确地传递国际油气行业新闻简讯。会时刻关注油气行业最新动态,呈现最迅捷、优质的国际油气资讯,让中国企业时刻把握国际油气动向,抓住商机,创造世界油气行业精彩未来。