logo
专注油气领域
与独立思考者同行

塞尔维亚NIS公司 “安装修井自动化系统”

招标方:塞尔维亚NIS公司 
招标项目:Implementation of well workover automation 

Project Description 
The Technical Assignment specifies the requirements for the creation of the information system “Well Workover Automation” (hereinafter referred to as – the System).

Project Goals and Tasks
The purpose of the project is to create the system of “Well Workover Automation”, aimed at automating the tasks of operative planning, monitoring and analysis of current and capital well workover (CCWW). The solution is considered as the support instrument for the above processes which are conducted constantly and cyclically. 

The solution is intended for the automation of the following areas of business activity of the Client’s specialists related to CCWO planning, recording and analysis: CCWO Planning, CCWO Result Recording, CCWO Result Control, Drafting of the Record on Conducted Works, CCWO Result Analysis.

详细技术详情见附件:4. Technical Assignment

投标要求见附件:5. Basic qualification criteria

截标时间:2016.09.12  

未经允许,不得转载本站任何文章:

石油圈招标信息服务Chloe
石油圈认证作者
石油圈持续跟踪全球石油行业招标信息,帮助国内企业及时准确地获取商机,助力中国企业走向海外。获取更详尽招标文件请联系Chloe(QQ:501868868,微信:xy1366200775,邮箱:xiaoyao@fonchan.com)。 OilSNS keeps track of global Oil &Gas tender information, leading suppliers to find their opportunities. For more information, please contact Chloe ( Email: xiaoyao@fonchan.com, Skype ID: jessicaxiao71@outlook.com)