招标方:PAKISTAN PETROLEUM LIMITED
招标编号:SV/SUI/110354/16
招标项目:Assessment of mechanical integrity of Frame 3 gas turbine exhaust stacks at Sui Gas Field
Scope of Work:
Following activities will be performed under Scope of Work for Assessment of Mechanical Integrity of Exhaust Stacks of Frame-III Gas Turbines:
1. Contractor will carry out visual inspection of exhaust stack both internally and externally and areas for possible structural weaknesses will be identified.
2. Contractor will carry out Ultrasonic Thickness Measurement of complete vertical stack followed by TML stickers pasting on identified areas.
3. Contractor will develop AutoCAD sketches of complete stack with thickness of respective areas mentioned on it.
4. On the basis of results of thickness measurement exercise and thermography contractor will carry out radiography of effected portion of stack (if required) for detection of cracks if any.
5. Contractor will carry out analysis of structural integrity of stack using Ansys or equivalent structural analysis software using the results of thermographic temperature analysis for assessing thermal stresses.
6. Contractor will submit report showing the results of structural/mechanical analysis and will recommend corrective action for improving the structural & mechanical integrity.
投标:
Separate Technical and Commercial Bid documents, complete in all respects, duly signed with official stamp and marked with the title of the tender and Collective No. in separate sealed envelopes shall be forwarded to the under noted address latest by 1500 hours, 10 August, 2016:
Ms. Ayesha Nasr
Senior Procurement Officer
Procurement Department
Pakistan Petroleum Limited,
4th Floor, PIDC House,
Dr. Ziauddin Ahmed Road,
P.O. Box No. 3942, Karachi.
Contractors or their agents are required to visit site personally before preparation / submission of bid and guarantee that with the exception of force majeure, they have taken into account all factors which includes but not limited to security situation, local influential ‘s, access to the site, working conditions and uncertainty of prices of material etc. and will complete work in given time and at quoted cost. All contingencies should be built in and no escalation in cost and time will be considered due to any reason.
For further clarifications please contact our Ms. Ayesha Nasr, Senior Procurement Officer (SPO), on Tel. 111-568-568 Ext. 4752, through email on a_ayesha@ppl.com.pk.
详细信息见附件:SVSUI11035416
未经允许,不得转载本站任何文章:
- 石油圈招标信息服务Chloe
-
石油圈认证作者
- 石油圈持续跟踪全球石油行业招标信息,帮助国内企业及时准确地获取商机,助力中国企业走向海外。获取更详尽招标文件请联系Chloe(QQ:501868868,微信:xy1366200775,邮箱:xiaoyao@fonchan.com)。 OilSNS keeps track of global Oil &Gas tender information, leading suppliers to find their opportunities. For more information, please contact Chloe ( Email: xiaoyao@fonchan.com, Skype ID: jessicaxiao71@outlook.com)