印度Indian Oil公司“API 5L管线采购”招标

招标单位:Indian Oil Corporation Limited(IOCL)
招标类型:Global Open E-Tender
招标编号:PLM/JPNPL/16/07

项目名称:API 5L Grade Line Pipes & Station Pipes
招标内容:

S.No. Pipe Wall

Thk.

API Gr. Type of

Coating

Manufacturing

Process

Stockpile Location Total

Quantity

(Meter)

OD

Line Pipes

1 12.75″ 0.25″   5LX46 PSL2 3LPE ERW/ Seamless Kotputli:149256m

Sampla: 148080m

297336
2 12.75″ 0.312″ 5LX46 PSL2 3LPE ERW/ Seamless Kotputli: 20148 m

Sampla: 5568 m

25716
3 12.75″ 0.375″   5LX46 PSL2 3LPE ERW/ Seamless Kotputli: 2340 m Sampla: 1596 m 3936
4 12.75″ 0.438″ 5LX46 PSL2 3LPE ERW/ Seamless Kotputli: 12792 m

Sampla: 4692 m

17484
5 12.75″ 0.375” 5LX46 PSL2 Bare ERW/ Seamless Kotputli: 192 m

Sampla: 192 m

384
6 18” 0.312” 5LGr. B Bare ERW/ LSAW/

HSAW

Kotputli: 300 m

Sampla: 480 m

780

Total

345636

Station Pipes

1 16” 0.375” 5L X52 Bare ERW/ Seamless Mohanpura: 2652m 2652
2 12.75” 0.375” 5L X52 Bare ERW/ Seamless Mohanpura: 180m 180
3 10.75” 0.365” 5L X52 Bare ERW/ Seamless Mohanpura: 48m

Rewari: 552m

Panipat: 468m

1068

Total

3900

注意事项:标书费:免费
投标保证金:USD 81,000
标书发售周期:2016.7.18-2016.8.16
标前会议时间:2016.7.27 15:00 p.m.
投标截止时间:2016.8.16 14:00 p.m.
开标时间:2016.8.17 15:00 p.m.

注意事项:
1. The stockpile location for Line pipes is Kotputli (Rajasthan) & Sampla (Haryana) to be arranged and maintained by bidder.
2. The stockpile location for Station Pipes is Mohanpura (Rajasthan), Rewari (Haryana) & Panipat (Haryana) of IOCL.
3. In the tender where the option of ERW/LSAW/ HSAW pipe is given, the bidder in its offer shall indicate the type of pipe manufacturing process considered.
4. As per-meter rate to be indicated in BOQ is all inclusive rate (inclusive of all levies and taxes) at stockpile location, bidder shall indicate applicable rate of excise duty and CST considered in their per-meter rate, in respective column given in BOQ for reference purpose.
5. C-form shall not be issued for this procurement.
6. Commencement of delivery within 4 months from the date of PO and completion within 8 months from the date of PO, with continuous delivery of pipes during this period. This is for complete scope of work including unloading and stacking of pipes at respective stockpile locations.