中国石化新闻网讯 据俄罗斯油气网2月26日华沙报道,波兰国家石油天然气公司(PGNiG)26日在华沙表示,美国联邦能源监管委员会(FERC)日前发布了一项命令,批准合资企业全球卡尔卡修帕斯公司(Global Calcasieu Pass)建造液化天然气(LNG)出口设施和相关的通向未来出口装置的天然气管道。 2018年,PGNiG与全球卡尔卡修帕斯公司签订了2份长期LNG采购合同。其中一项涉及从路易斯安那州卡尔卡修帕斯终端接收LNG,该终端将在2022年开始运营。 PGNiG首席执行官彼得亚雷说:“我们祝贺我们的美国合作伙伴获得最终批准。我们密切关注全球卡尔卡修帕斯公司开发的两个项目的进展。从2022年起,我们每年将从这个新建终端接收100万吨LNG,大约相当于再气化后的13.5亿立方米天然气。这个项目是我们LNG合同组合中的一个重要组成部分,它将使我们不仅为波兰提供天然气供应,而且在全球液化天然气市场上出售天然气。” 根据全球卡尔卡修帕斯公司的公告,该公司将立即在路易斯安那州的卡梅隆教区开始建设活动。除了PGNiG以外,全球卡尔卡修帕斯公司还与壳牌公司、英国石油公司、Edison、Galp和雷普索尔公司签署了液化天然气长期SPA合同。 李峻 编译自 俄罗斯油气网 原文如下: PGNiG welcomed the decision to grant approval for the construction of the Calcasieu Pass LNG terminal Ndeftegaz.RU. According to Polish PGNiG, the US Federal Energy Regulatory Commission (FERC) has issued the Order Granting Authorizations for Venture Global Calcasieu Pass LNG export facility and associated gas pipelines leading to future export installations.
In 2018, PGNiG signed 2 long-term contracts with Venture Global LNG for the purchase of LNG. One of them relates to receiving cargoes of LNG from the terminal at Calcasieu Pass in Louisiana, which is due to start operations in 2022. «We congratulate our American partners on obtaining final approval. We closely follow the progress of both projects developed by Venture Global LNG. From 2022, we will receive 1 mln tonnes of LNG from the Calcasieu Pass annually, which equals approx. 1.35 billion m³ of gas after regasification, and the same volume from the Plaquemines terminal, which will be built a year later. This is an important element of our portfolio of LNG contracts. It will allow us not only to provide supplies for Poland, but also to trade LNG on the global market», commented Piotr Woźniak, CEO of PGNiG. According to the announcement of Venture Global LNG, the company will immediately commence construction activities at Cameron Parish in Louisiana. Venture Global LNG, apart from PGNiG, has signed long-term SPA contracts for LNG deliveries with Shell, BP, Edison, Galp and Repsol.
未经允许,不得转载本站任何文章: