中国石化新闻网讯 据世界天然气网1月17日消息 澳大利亚液化天然气生产商伍德赛德(Woodside)报告称,由于价格上涨,2018年第四季度的销售收入有所增加。 与2017年同期相比,伍德赛德的收入在本季度增长了43%,达到14.2亿美元。 伍德赛德报告称,其液化天然气项目已实现较高的价格,价格同比和季度环比都呈上涨趋势。本季度实现的最高价格是雪佛龙领导的Wheatstone液化天然气项目,达到11.2美元/每百万英热单位,其次是Pluto液化天然气项目,10.8美元/每百万英热单位,NWS液化天然气项目9.2美元/每百万英热单位。 该公司在其报告中称,该季度的产量也升至2410万桶油当量,比2017年第四季度的数据高出10%,将年产量推至9140万桶油当量,比2017年产量高出8%。 当谈到结果时,伍德赛德首席执行官Peter Coleman说:“第四季度,基础业务又一次表现强劲,Wheatstone的产量继续超过预期。” 他补充说,本季度的重点是10月份Greater Western Flank 2期项目的启动,比计划要提前6个月,总预算为6.3亿美元。 Coleman还表示,公司已采取措施以开发Burrup枢纽,为拟建的Pluto西北架互连天然气管道提供原料,并向Bechtel授予Pluto液化天然气设施和管道原料合同。 伍德赛德在其报告中表示,2019年的产量预计在880至940万桶油当量之间,2019年的投资支出预计在16至17亿美元之间。 王磊 摘译自 世界天然气 原文如下: Higher production and prices boost Woodside’s Q4 revenue Australian LNG player Woodside reported a jump in sales revenue for the fourth quarter of 2018, on the back of higher prices. Woodside’s revenue climbed 43 percent to $1.42 billion during the quarter under review, when compared to the corresponding quarter in 2017. Woodside reported higher realized prices across its LNG projects with prices rising year-on-year and quarter-on-quarter. Highest realized price for the quarter was at the Chevron-led Wheatstone LNG project reaching $11.2 per mmBtu followed by $10.8/mmBtu at Pluto LNG and $9.2/mmBtu at NWS LNG. The production also rose during the quarter to 24.1 mmboe, 10 percent above Q4 2017 figures, pushing the annual production to 91.4 mmboe, 8 percent above the 2017 volumes, the company said in its report. Speaking of the results, Woodside’s CEO Peter Coleman said, “the base business turned in another strong performance in the fourth quarter, with Wheatstone’s production continuing to exceed expectations.” He added that the highlight of the quarter was the “start-up of the Greater Western Flank Phase 2 project in October, six months ahead of schedule and $630 million under total budget.” He also reminded that the company has taken steps forward in developing the Burrup hub with the FEED for the proposed Pluto-North West Shelf Interconnector gas pipeline and the Pluto LNG facilities and pipeline FEED contract awarded to Bechtel. In its report, Woodside said its production guidance for 2019 has been set between 88 and 94 mmboe, with its investment expenditure guidance for 2019 lading between $1.6 and $1.7 billion.
未经允许,不得转载本站任何文章: