漏油应急方面的专家Briggs公司同BP公司签署了为期五年的合同,公司将主要负责四十号管道系统(FPS)的漏油事件并为Scotland北部的漏油事件提供应急服务。
Briggs公司将为BP公司发生的漏油事件提供专家性的建议,并帮助现场负责人协调处理漏油事故。Briggs公司也将协调组织包括维护、培训和演习方面的工作。
公司还将为BP公司配备漏油响应设备,组织事故应急上门服务,参加该地区的培训和学习。经过竞争投标后,合同价值才得以披露,从2016年4月1日起施行并可能延长五年。
公司环境服务部主管Pat Diamond表示:“赢得BP公司的这次招标,成功证明了我们的技术能力足以提供良好的漏油响应服务”。
来自/Energyvoice 5月6日消息 编译/吴海君
Oil spill response specialist Briggs has secured a five-year contract from BP to act as its oil spill lead across the Forties Pipeline System (FPS) and to provide response services in the north of Scotland.
Briggs will provide specialist advice to BP in the event of an oil spill incident and support BP’s incident commander by assisting with the coordination of the response effort. Briggs will also coordinate preparedness activities such as maintenance, training and exercises.
The firm will also store BP-owned oil spill response equipment and materials, attend emergency call-outs in the event of an incident and participate in training sessions and exercises in the region.
The contract – the value of which has not been disclosed -was awarded after a competitive tender process and commenced on 1st April 2016, with the possibility of a five-year extension.
Briggs director of environmental services Pat Diamond, said: “We are delighted that we have managed to successfully demonstrate our technical capability in providing oil spill response services to win this BP tender.”
未经允许,不得转载本站任何文章:
-
- 吴海君
-
石油圈认证作者
- 毕业于中国石油大学(华东),油气田开发硕士,英语双学位。第一时间为您提供原创国际油气资讯,真实反映每时每刻新闻热点,秉承国际化视野,力求及时、客观、权威、独立地报道新闻。