Statoil已经签订了两项关于Huldra钻井平台回收及处理的合同:
- 与Heerema Marine Contractors Nederland SE签订平台的工程,制备,回收合同。
- 与AF Gruppen ASA.子公司AF Offshore Decom AS签订钻井平台的处理和重复利用合同。
该钻井平台的总重量约为10000吨,包括甲板设备5000吨,平台架构5000吨。预计平台超过95%的部分将被回收。石油圈原创www.oilsns.com
本计划将到在2019年回收Huldra 钻井平台,后续处理和重复利用工作将在2020年上半年在挪威Vats的AF Offshore Decom基地开展。
来自/worldoil 4月13日消息 编译/张弘引
Statoil has now awarded two new contracts for the removal, transportation, disposal and recycling of the Huldra platform.
- The Engineering, Preparation and Removal (EPR) contract has been awarded to Heerema Marine Contractors Nederland SE.
- The contract for disposal and recycling of the platform has been awarded to AF Offshore Decom AS, a subsidiary of AF Gruppen ASA.
The total weight of the platform is approximately 10,000 tons, distributed over a 5,000 ton topside and a 5,000 ton steel jacket. It is expected that more than 95% of the platform will be recycled.
The plan is to remove the Huldra platform during 2019 with the subsequent disposal and recycling work taking place at AF Offshore Decom’s environmental base in Vats, Norway, within the first half of 2020.
未经允许,不得转载本站任何文章:
-
- 张弘引
-
石油圈认证作者
- 毕业于南开大学翻译系,具有丰富的翻译经验,能够快速、准确地将全球油气动向以中英文双语进行报道。提供专业化、全方位的国际资讯服务,呈现纷繁世界的精彩之处,满足中国企业了解世界、融入世界的需求。