Gaz du Cameroun公司周三宣布,开钻位于喀麦隆Douala的Logbaba气田La-107和La-108开发井。两井将从Logbaba加工工厂旁边的钻井台进行定向钻探,并且一旦完成钻井就将被固定到这套设施中。两口井将成为生产井,Logbaba岩层于上白垩纪(坎帕阶和桑顿阶)形成,岩层很厚,由砂岩和页岩叠加而成,位于地下5577英尺和1.0498万英尺之间。
两口井钻探的预算总额约为4000万美元,资金预计将来自公司收益和合作伙伴出资。钻探将于2017年第二季度完成。石油圈原创 www.oilsns.com
来自/Rigzone 11月2日消息 编译/陈芊芊
Gaz du Cameroun S.A. announced Wednesday the spudding of development wells La-107 and La-108 in the Logbaba Gas Field located in Douala, Cameroon. Both wells will be drilled directionally from a drilling pad adjacent to the Logbaba processing plant, and will be tied into this facility once completed. The wells are intended to be production wells completed in the Upper Cretaceous (Campanian and Santonian) Logbaba Formation, which is a thick sequence of interbedded sands and shales found at depths between 5,577 feet and 10,498 feet below the surface.
The budget total for the two well program is approximately $40 million, which is expected to be funded by revenue and partner contributions. Drilling is scheduled to complete in the second quarter of 2017.
未经允许,不得转载本站任何文章:
-
- Vivian
-
石油圈认证作者
- 就读于南开大学翻译专业,具有丰富的翻译经验。致力于准确及时地为您提供国际油气行业的新闻资讯,传达最新动向。