中国石化新闻网讯 据世界天然气网1月7日消息 英国Dragon LNG终端计划在本周末从卡塔尔接收另一批液化天然气货物。 来自米尔福德港管理局的数据显示,载货量为21.02万立方米的Al Sheehaniya液化天然气油轮将于1月12日在该码头停靠。 位于朋布洛克郡米尔福德港沃特斯顿的终端归壳牌(50%)和马来西亚国家石油公司(50%)所有。 该设施最大天然气输出率为每年76亿立方米,可满足英国高达10%的能源需求。 运输货物的船只是由韩国造船厂大宇造船和海洋工程公司(DSME)于2010年为卡塔尔天然气运输公司(Nakilat)建造。 王磊 摘译自 世界天然气 原文如下: The UK’s Dragon LNG terminal is scheduled to receive another cargo of liquefied natural gas from Qatar at the end of the week. Data from the Milford Haven Port Authority shows the Al Sheehaniya LNG tanker with a cargo carrying capacity of 210,200 cubic meters will dock at the facility on January 12. The terminal at Waterston, Milford Haven in Pembrokeshire, is owned by Shell (50 percent) and Petronas (50 percent). The facility has a maximum gas send out rate to the NTS of 7.6 billion cubic meters of gas per annum. The terminal can supply up to 10 percent of the UK’s energy needs. The vessel transporting the cargo was built by the South Korean shipbuilder Daewoo Shipbuilding & Marine Engineering (DSME) to Nakilat in 2010.
未经允许,不得转载本站任何文章: